Your search for perfect homes starts here

Projects /

Galleria 03 Condos – Coming in September

Property Rating

1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...
Completion: 2023

Description

Interview with the President of PSR, Ryan Ravinovich

Galleria 03 Condos is a third phase of a new master-planned community pre-construction Condos project developed By Elad Canada. It is located at 1245 Dupont St in Toronto at the major intersection of Dufferin Street and Dupont Street with a total of 3400 units.

Galleria Condos 3

Galleria 03 Condos Highlight:

  • TTC Stop Just at the Front Door
  • walking distance to the Park
  • retail and residential uses Mix Development.
  • Step to shops, dining and Entertainment.
  • Major master planned community
  • GO, TTC, and UPX is a 15-minute walk away
  • 300,000sq ft of brand new retail
  • Mins away from 2 subway stations and the UP express so you can quickly access any point you want in Toronto
  • Brand new 95,000sq.ft Community Centre and 8 Acre park!

 

The new 95,000 Sq Ft community Centre will be one of the largest in Toronto, offering indoor and outdoor options for play, and ways to rejuvenate and socialize. Along with a gym and multipurpose rooms, outdoor skating trail, daycare, swimming pools, dance studio, running track, and complete fitness facilities. This centre will also include a child care centre and playground.

A few articles by the media that came out:

Livabl: https://www.livabl.com/2019/09/elad-canada-first-phase-galleria-on-the-park.html

Urban Toronto: https://urbantoronto.ca/news/2019/09/galleria-01-first-phase-galleria-park-revealed

RENX: https://renx.ca/elad-unveil-development-galleria-on-the-park-toronto/

Building Magazine: https://building.ca/elad-canada-reveals-first-phase-of-galleria-on-the-park-development/

Canadian Architect: https://www.canadianarchitect.com/elad-canada-reveals-first-phase-of-galleria-on-the-park-development/

Building Features:

Galleria On The Park plans for the Galleria site clump the location together with the existing Wallace Emerson Community Centre to the south. The land would be dissected by a new diagonal road, with the area to the south turned into parkland. To the north, two new streets and a pedestrian walkway would be lined with two floors of ground-level retail. The condos, 3,400 units, would then be stacked on top. In all, the site would include 12 towers, most 12 to 22 storeys, but with three along Dupont at 36 storeys, 42 storeys and 34 storeys.

The architect for this project is by Hariri Pontarini Architects and Urban Strategies Inc. Galleria On The Park includes a landscaping plan by Public Work, as well as an emerging transit and mobility strategy by the BA Group.

Furthermore, it Will Have the six new blocks proposed all feature a retail-dominated street level, with a combination of commercial office and residential space above. At the east end of the reconfigured park, a new mixed-use block replaces the community centre at  ‘Block 5.’ Meanwhile, the new community centre—which will include more diverse programming—is situated at the northwest of the park.

It has a great Walk Score of 95 out of 100. Transit score of 82 out of 100. This location is in the Dovercourt-Wallace Emerson-Juncti neighborhood in Toronto. Nearby parks include Brandon Avenue Parkette, Bartlett Parkette and Campbell Avenue Park

Galleria On The Park Neighbourhood video

 

 


Floor Plan & Price List

 
 


Location

More Projects in this area

Email Us Call Us VIP Platinum Search